SAMPLE PROJECTS
While this is not an exhaustive list of projects we’ve worked on, this provides a good sample of what Hydrolink Engineering is capable of:
Auburn Hills (McKinney) - Floodplain Reclamation, Hydrologic Timing Analysis & LOMR Submittal to FEMA
Carpenter Park (City of Plano) – Modeling & Design of Improvements to transform concrete trapezoidal channel into a system of ponds for one of Plano’s flagship parks.
The Tribute (The Colony) – Flood Study for stepped pond design, creek stabilization, FEMA submittals and water study.
Hometown Canal District (North Richland Hills) – Design & Modeling of a system of stepped ponds in series with a subsequent flood study submittal to the city
Caraway (Haslet) - Floodplain Reclamation, On-stream Detention Design & Modeling & LOMR Submittal to FEMA
Devonshire (Forney) - Design & Modeling of on-stream detention as well as modifications to existing ponds
River Place (Garland) - Floodplain Reclamation Feasibility Analysis & subsequent City Flood Study
Trails at Riverstone (Princeton) - Floodplain Reclamation Feasibility Analysis & subsequent City Flood Study
W. Spring Street Drainage Improvements (City of Mason) - Design & Modeling of drainage solution for the city
The Preserve (Grapevine) – Floodplain Reclamation and LOMR-F to FEMA
Waterbrook (Argyle) - Floodplain Reclamation, On-stream Detention Design & Modeling & LOMR Submittal to FEMA
Gateway Parks (Forney) – Pond Modeling & Design of Detention Ponds for multiple different storm events
Sandbrock Ranch (Aubrey ETJ) – Floodplain Reclamation Feasibility Analysis and subsequent CLOMR to FEMA
Ridge Road Extension (McKinney) – Hydraulic modeling for proposed bridge sizing
Shady Brook (Grapevine) - Existing Condition Flood Study
Lakewood (Forney) - Floodplain Reclamation Feasibility Analysis & subsequent City Flood Study
Bob Woodruff Park Trail Improvements (City of Plano) – Hydraulic modeling of trail improvements in the FEMA floodway
Silverado (Aubrey ETJ) - Unsteady flow modeling for detention pond design, spillway sizing, culvert sizing & floodplain modeling
Timineri Estates (Princeton) - Floodplain Reclamation Feasibility Analysis & subsequent City Flood Study
Union Square (Royse City) - Detention Pond Design, Hydraulic Modeling and TxDOT coordination
Magnolia Pointe (Josephine) – Detention Pond Design & Modeling
Finch Park (City of McKinney) – Hydrologic & Hydraulic modeling for park improvements
Parkside (Prosper) – Flood Study / Spillway Design & Modeling for improvements to existing on-stream pond
Somerset (Mansfield) – Detention pond modeling and iSWM submittals
Fireside By The Lake (Dallas) - Detention pond design, culvert sizing & Floodplain modeling
Cambridge Brook (Denton) - Hydrologic Timing Analysis & Floodplain Modeling
The Ridge (Northlake) - Detention pond design modeling & iSWM submittals
Hidden Valley Estates (Ovilla) - Hydrologic Timing Analysis & Floodplain Modeling
Watercress (Haslet) - Design modeling for a network of detention ponds
Sonic (Fort Worth) – Floodplain modeling and iSWM submittals